Liberty, Texas Plant

Our 500,000 square foot facility houses heat treat capability of 250,000 tons per year and two Electric Resistance Welding (ERW) mills with 360,000 tons of annual capacity for ERW pipe.  We offer full in-house finishing with two PMC and CNC thread lines along with a dedicated Semi-Premium thread line, and our high-speed hydrostatic testers keep up with mill speeds and assure quality.  The Liberty facility also boasts two full length, full body Olympus ultrasonic inspection units and advanced threading capabilities.

  • Heat treating Coupling Stock (CS) in the seamless range with customer-specific sizes and gauges
  • 2 complete pipe mills for maximum output
  • Full range of heat treat services
Appointment and Logistics Scheduling:

To establish a pick-up appointment, please send an email request to releaseit@boomerangtube.com or phone us at 713-289-5555. We appreciate notification at least 2 days in advance if possible. We will contact you with an approval or suggest other available time slots should we be unable to fulfill your specific request. Standard loading times are 8:00 am – 7:00 pm, but we work with our customers on scheduling outside this window to help satisfy their needs.